Goal: Show worthy car by H20 2011
Car: 1986 Vw Cabriolet
Time:16 days start to finish
To do list:
-install VR6 motor
-convert to CE2 wiring
-build exhaust system
-install New top
-install new headliner
-install New carpet
-strip entire car down and paint exterior, doors, engine bay, under body, fender wells, door jambs, trunk
-install new wheels
-install entire new suspension
-recover or replace interior seats, door panels
-install new stereo system
pretty much replace everything part on the entire car in less than 16 days, and drive it 13hrs from North Carolina to H20. I will be taking pictures and videos along to way!
Wish me luck!
DAY 1
I drove to winston salem to pickup the car, about 2 hrs away. Towed the car back (driving condition) drove the car in the shop and this is what it looked like. I drove the car into the door at 7:00pm so we were already behind schedule on day 1
Car: 1986 Vw Cabriolet
Time:16 days start to finish
To do list:
-install VR6 motor
-convert to CE2 wiring
-build exhaust system
-install New top
-install new headliner
-install New carpet
-strip entire car down and paint exterior, doors, engine bay, under body, fender wells, door jambs, trunk
-install new wheels
-install entire new suspension
-recover or replace interior seats, door panels
-install new stereo system
pretty much replace everything part on the entire car in less than 16 days, and drive it 13hrs from North Carolina to H20. I will be taking pictures and videos along to way!
Wish me luck!
DAY 1
I drove to winston salem to pickup the car, about 2 hrs away. Towed the car back (driving condition) drove the car in the shop and this is what it looked like. I drove the car into the door at 7:00pm so we were already behind schedule on day 1
Comment