Announcement

Collapse
No announcement yet.

300zx Twin turbo Manual Stance Build

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • #31
    Slowly working on my zed so it looks as good as possible got the 99 spec rear console installed, we have also installed my old exhaust on uk zed and painted some water pipes

    Video link : https://www.youtube.com/watch?v=0XcBDKP0iSg

    Comment


    • #32
      One of the worst interior jobs to do is to change a heater core, it was time consuming and annoying, but it had to be done as it started leaking badly, my carpet was soaking wet and radiator empty haha

      Video : https://www.youtube.com/watch?v=0Kd4K8eRShs

      Comment


      • #33
        Had some electrical issues today as my plugs got corroded and a boost leak, but hopefully everything got fixed. My zed runs again lol
        Link to a video : https://www.youtube.com/watch?v=KcBNTaHWA6o

        Comment


        • #34
          nice work bud

          Comment


          • #35
            NO Camber WEEEEE! nice clean good fitment.

            Comment


            • #36
              We have started a long journey today of re shelling an old rusty zed to a rust free shell. Today's priority was to disassemble the engine, start swapping interior, suspension, lights and etc,

              Link to a video: https://www.youtube.com/watch?v=CQcQ7PKqyV4

              Comment


              • #37
                It is day 2 of us reshelling this zed. We are moving slowing but the work is getting done! rear subframe is finally swapped and interior is almost done

                Link to a video : https://www.youtube.com/watch?v=4E5hO4g44qg

                Comment


                • #38
                  Finally we took the engine out, sorted out clutch pipes, done few deletes and got the engine in and the hks intercoolers on the shell

                  Video : https://www.youtube.com/watch?v=_w_IXwkOKJ8

                  Comment


                  • #39
                    We are almost done! Engine is 100% wired, all pipes are in, intercooler pipes are connected and etc. Engine runs without any issues on all 6 cylinders, no problems from the loom as I was scared moving that 27 year old loom around. We are on the final stretch of finishing this zed

                    Video : https://www.youtube.com/watch?v=VqQR86ZJSnM

                    Comment


                    • #40
                      Finally 300zx is done, all its left is to get those door cards on and thats it boot is finished, exhaust is on and etc. We have also installed 300zx carpet in to s13 and cleaned some corroded wiring plugs today.

                      Video link: https://www.youtube.com/watch?v=gcmbYeIfza8

                      Comment


                      • #41
                        I am watching closely.. Love the work, keen to see the end product. You going to wrap the re-shelled zed too?

                        Comment

                        Working...
                        X